Reconstruction in North Hempstead
Older homes here have details worth matching: plaster, crown molding, wide door casings, oak floors. We repair or match them as closely as we can and tell you when an exact match isn't possible.
Co-op and condo rebuilds usually need board approval and work-hour limits. We plan the schedule around them.
Some neighborhoods in North Hempstead are in historic districts or villages with their own design rules for exterior work. The village building department can tell you what applies before we order materials.
What we see most here
- Matching plaster and older trim
- Oak floor repairs and refinishing
- Co-op board approvals
- Basement rebuilds after leaks
How the job goes
Scope
We write up what has to be rebuilt, from the studs out, and what it will be finished with.
Pick finishes
Flooring, paint, cabinets and tile. We'll show you the closest match to what was there and any options.
Schedule
You get a schedule with material lead times before work starts.
Build
Insulation, drywall, flooring, cabinets, tile, trim and paint, in that order.
Walk-through
We walk the finished work with you and fix anything on the punch list.
More on reconstruction & repairs
Villages and hamlets we cover in North Hempstead
Great Neck, Great Neck Estates, Great Neck Plaza, Kings Point, Lake Success, Port Washington North, Manorhaven, Sands Point, Plandome, Munsey Park, Flower Hill, Roslyn, East Hills, Westbury, Williston Park, East Williston, Mineola, Manhasset, Port Washington, Roslyn Heights, Albertson, Carle Place, Herricks, Searingtown, Greenvale, and New Cassel.
Questions people ask
Can you match my old oak floor?
Usually, with new boards woven in and the whole room refinished so it reads as one floor.
How long does a rebuild take?
One room can be a week or two. A whole finished basement or a fire job takes longer, and material lead times matter. You'll get a schedule before we start.