(631) 814-0672

Reconstruction & Repairs in the Town of Hempstead

Rebuilding in the Town of Hempstead after water, fire, mold or storm damage.

Call (631) 814-0672

Reconstruction in Hempstead

Levitt capes and ranches have been expanded and changed so many times that no two are the same inside. When we rebuild, we work with what's there now, not the original plan. Older homes in the villages have plaster walls. We repair plaster where it makes sense and use drywall where it doesn't, and we'll tell you which and why.

South Shore homes may be in a FEMA flood zone, and some major repairs there can trigger requirements about elevation and flood-resistant materials. The building department can tell you what applies to your address.

What we see most here

  • Matching flooring and trim in older homes
  • Plaster repair in the villages
  • Basement rebuilds with materials that handle damp
  • Flood zone rules on the South Shore

How the job goes

  1. Scope

    We write up what has to be rebuilt, from the studs out, and what it will be finished with.

  2. Pick finishes

    Flooring, paint, cabinets and tile. We'll show you the closest match to what was there and any options.

  3. Schedule

    You get a schedule with material lead times before work starts.

  4. Build

    Insulation, drywall, flooring, cabinets, tile, trim and paint, in that order.

  5. Walk-through

    We walk the finished work with you and fix anything on the punch list.

More on reconstruction & repairs

Villages and hamlets we cover in Hempstead

Freeport, Garden City, Rockville Centre, Valley Stream, Lynbrook, Malverne, East Rockaway, Island Park, Lawrence, Cedarhurst, Atlantic Beach, Floral Park, Stewart Manor, Hempstead Village, Levittown, East Meadow, Baldwin, Oceanside, Merrick, Bellmore, Wantagh, Seaford, Uniondale, Elmont, Franklin Square, West Hempstead, Woodmere, Point Lookout, and Lido Beach.

Questions people ask

Should I put carpet back in my basement?

In a damp basement, vinyl plank or tile handles water much better. Carpet over concrete is where we see the most mold.

How long does a rebuild take?

One room can be a week or two. A whole finished basement or a fire job takes longer, and material lead times matter. You'll get a schedule before we start.

Call and tell us what happened. We'll tell you what to do until we get there.

Call (631) 814-0672
Call (631) 814-0672