Reconstruction in Long Beach
Much of Long Beach is in a FEMA flood zone. Larger repairs can trigger rules about elevation and flood-resistant materials. The city building department can tell you what applies.
At ground level, we use materials that can get wet and dry out: tile, vinyl plank, and moisture-resistant board where allowed.
Long Beach is a city, so it isn't part of any town. It has its own city government and building department.
What we see most here
- Flood zone rules
- Flood-resistant materials at ground level
- Attached and tight-lot homes
- Roof and siding repairs after wind
How the job goes
Scope
We write up what has to be rebuilt, from the studs out, and what it will be finished with.
Pick finishes
Flooring, paint, cabinets and tile. We'll show you the closest match to what was there and any options.
Schedule
You get a schedule with material lead times before work starts.
Build
Insulation, drywall, flooring, cabinets, tile, trim and paint, in that order.
Walk-through
We walk the finished work with you and fix anything on the punch list.
More on reconstruction & repairs
Neighborhoods we cover in Long Beach
West End, East End, North Park, The Canals, Westholme, Presidents Streets, The Walks, and Central business district.
Questions people ask
Do I have to raise my house to repair it?
Only if the repair is big enough to trigger the rules. The building department decides based on the cost compared with the home's value.
How long does a rebuild take?
One room can be a week or two. A whole finished basement or a fire job takes longer, and material lead times matter. You'll get a schedule before we start.