Reconstruction in East Hampton
Custom millwork, wide-plank floors and specialty finishes take longer to match. We'll give you options and a realistic schedule.
East Hampton Village and Sag Harbor have their own building departments and historic district rules.
Wide-plank and reclaimed floors are hard to match off the shelf. Sometimes boards from a closet or a less visible room get moved to the patch, and new boards go where they won't be seen.
What we see most here
- Matching custom millwork
- Wide-plank floors
- Historic district rules
- Seasonal schedules
How the job goes
Scope
We write up what has to be rebuilt, from the studs out, and what it will be finished with.
Pick finishes
Flooring, paint, cabinets and tile. We'll show you the closest match to what was there and any options.
Schedule
You get a schedule with material lead times before work starts.
Build
Insulation, drywall, flooring, cabinets, tile, trim and paint, in that order.
Walk-through
We walk the finished work with you and fix anything on the punch list.
More on reconstruction & repairs
Villages and hamlets we cover in East Hampton
East Hampton Village, Sag Harbor (East Hampton side), Amagansett, Springs, Montauk, Wainscott, Northwest Harbor, and Napeague.
Questions people ask
Can the work be done before summer?
That depends on the scope and material lead times. Call early.
How long does a rebuild take?
One room can be a week or two. A whole finished basement or a fire job takes longer, and material lead times matter. You'll get a schedule before we start.